Brandon Shores
  • Demolish an existing coal barge unloader. 
  • Drive sheet piling for 2 - 40’ diameter, 80’ deep cofferdam cells to support a new barge  unloader and barge haul system. 
  • Drive pipe piles and construct concrete  foundations on land and water for conveyor  system.
  • Construction of a 13,000 ft structural steel  conveyor system to transport limestone into the powerhouse, and gypsum back out to the barges. 
  • Other work included refurbishing dauphins, cells, seawalls, and installing a new fender  system. 
spacer
BRANDON SHORES MATERIAL HANDLING SYSTEM
spacer
spacer
Location   Baltimore, MD
Firm's Responsibility   Prime
Owner   Constellation Energy
Contact   Rick Bradyhouse
Project Completion Date   2009
spacer