- Demolish an existing coal barge unloader.
- Drive sheet piling for 2 - 40’ diameter, 80’ deep cofferdam cells to support a new barge unloader and barge haul system.
- Drive pipe piles and construct concrete foundations on land and water for conveyor system.
- Construction of a 13,000 ft structural steel conveyor system to transport limestone into the powerhouse, and gypsum back out to the barges.
- Other work included refurbishing dauphins, cells, seawalls, and installing a new fender system.
|
|